
New Custom Modular Homes built to meet your design. Our desire is to build your home and meet budgetary requirements using our FHT quality modular construction and brand name products. Since 1986, we have been reinventing the future of home building using our modular construction techniques in our state of the art construction facility. We are proud of the over 6,000 families who are enjoying their homes built by our company.
Friday, March 8, 2013
Future Home Technology has manufactured multi-family / townhouse style homes for numerous years. Pictured above are two multi-family projects we built and is located in Port Chester and Rye Brook, New York.
We can custom design or if you have architectural drawings, we can design on our CAD system to fit modular.
Call us today!
(845) 856-9033
www.futurehometechnology.com
Capability Statement for Recovery Work from Superstorm Sandy
Port Jervis, NY, November 1,
2012
Future Home Technology’s objective is to assist federal,
state and municipal agencies in providing temporary and replacement housing for
the victims of Superstorm Sandy.
Future Home Technology, Inc (FHT) has been the leading
manufacturer of custom-designed single and multifamily modular homes since 1989
in the NY tri-state area. Whereby we design, engineer and build residential
structures from concept to a finished home. We are a vertically integrated wood-framed
modular manufacturer. We design
according to applicable local building codes, issue complete “permit” plans for
approval, construct and assemble on-site wood modular and panelized structures
for the creation of individual freestanding homes or multifamily/multilevel
apartment units. FHT is the “one-stop shop” and a complete solution to
efficiently and expeditiously provide quality housing for the displaced from
this latest natural catastrophe. We employ more than 80 skilled technicians in
our state-of-the-art 110,000 square foot facility located in Port Jervis, NY at
the confluence of NY, NJ and PA.
In light of Superstorm Sandy and for the specific purpose
of providing temporary housing, FHT has designed efficient single and
multifamily units that can be manufactured economically and at scale; the units
could receive certificate of occupancy and be occupied within two to three
weeks from order release. We can ramp-up
volume and sustain high tempo of production and on-site installation based on
demand.
We have developed preliminary multifamily designs which
include one to three bedroom units from 720 SF to about 1,400 SF, respectively
for temporary housing. Similarly we have
developed single family homes, varying by design and ranging from 900 SF to
3,800 SF and based upon housing needs. Budget pricing for temporary housing of
$65/SF includes completely constructed units, delivery, set/assembly, sales tax
and on-site utility connections for certificate of occupancy. (Budget price
does not include site work, foundation, excavation, permit fees, or site
utilities.)
Our manufacturing facility is located in Port Jervis, NY,
along the Delaware River, less than two miles from Interstate I-84. We
efficiently receive raw material, have access to ample skilled labor, can
transport our modular products from Maine to Maryland and can complete
installation within the same day of departure.
Over the last 23 years we have produced more than 6,000 homes and have done
so by operating successfully and profitably.
We are looking forward to becoming part of the solution
to bring normality back to the lives of those affected by the Superstorm.
Subscribe to:
Posts (Atom)