Friday, March 8, 2013



Capability Statement for Recovery Work from Superstorm Sandy

Port Jervis, NY, November 1, 2012

 

 

Future Home Technology’s objective is to assist federal, state and municipal agencies in providing temporary and replacement housing for the victims of Superstorm Sandy.

 

Future Home Technology, Inc (FHT) has been the leading manufacturer of custom-designed single and multifamily modular homes since 1989 in the NY tri-state area. Whereby we design, engineer and build residential structures from concept to a finished home. We are a vertically integrated wood-framed modular manufacturer.  We design according to applicable local building codes, issue complete “permit” plans for approval, construct and assemble on-site wood modular and panelized structures for the creation of individual freestanding homes or multifamily/multilevel apartment units. FHT is the “one-stop shop” and a complete solution to efficiently and expeditiously provide quality housing for the displaced from this latest natural catastrophe. We employ more than 80 skilled technicians in our state-of-the-art 110,000 square foot facility located in Port Jervis, NY at the confluence of NY, NJ and PA.

 

In light of Superstorm Sandy and for the specific purpose of providing temporary housing, FHT has designed efficient single and multifamily units that can be manufactured economically and at scale; the units could receive certificate of occupancy and be occupied within two to three weeks from order release.  We can ramp-up volume and sustain high tempo of production and on-site installation based on demand.

 

We have developed preliminary multifamily designs which include one to three bedroom units from 720 SF to about 1,400 SF, respectively for temporary housing.  Similarly we have developed single family homes, varying by design and ranging from 900 SF to 3,800 SF and based upon housing needs. Budget pricing for temporary housing of $65/SF includes completely constructed units, delivery, set/assembly, sales tax and on-site utility connections for certificate of occupancy. (Budget price does not include site work, foundation, excavation, permit fees, or site utilities.)

 

Our manufacturing facility is located in Port Jervis, NY, along the Delaware River, less than two miles from Interstate I-84. We efficiently receive raw material, have access to ample skilled labor, can transport our modular products from Maine to Maryland and can complete installation within the same day of departure.  Over the last 23 years we have produced more than 6,000 homes and have done so by operating successfully and profitably.

 

We are looking forward to becoming part of the solution to bring normality back to the lives of those affected by the Superstorm.

No comments:

Post a Comment